Reference: E2354GXLPMED
The supply, delivery, installation and commissioning
ESKOM
Key Dates
Published
December 15th, 2025
Closing Date
Wednesday, 18 February 2026 - 10:00
Description
The supply, delivery, installation and commissioning of temperature monitoring devices at Medupi Power Station for a period of 1 year. Category: Electricity, gas, steam and air conditioning Type: Request for Bid(Open-Tender) Department: ESKOM
Sectors & Regions
Sectors
Regions
Documents (30)
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - 19 March 2025.pdf
PDF • 1109.2 KB
Medupi Power Station OHS Specification-TMD.pdf
PDF • 866.0 KB
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
PDF • 625.8 KB
240-109253698 CQP Template 2021.docx
DOCX • 99.2 KB
240-77471499 Annexure B.docx
DOCX • 82.7 KB
Example sworn affidavit completion rev 1-1.pdf
PDF • 186.0 KB
Annex-c_Local content Declaration-Summary Schedule.pdf
PDF • 16.1 KB
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
PDF • 25.1 KB
E-Tenderers E-Tendering Training Acknowledgement Form.docx
DOCX • 116.3 KB
Eskom's (SHEQ) Policy poster (32-727) 27 March 2024 - REV 8.pdf
PDF • 469.3 KB
01122025_TEMPERATURE MONITORING_ Form A_Cat 2_ .pdf
PDF • 188.4 KB
Revised- TES for Temperature Monitoring in Switchgear rooms_.pdf
PDF • 664.4 KB
E-tendering Help Manual for supplier - 27 January 2025.docx
DOCX • 1103.5 KB
32-95 OHS Incident Management Pocedure Rev 9 - 30 March 2021.pdf
PDF • 712.5 KB
Link for Clarification meeting.docx
DOCX • 14.2 KB
Revised NEC.docx
DOCX • 207.3 KB
240-105658000 Supplier Quality Management Specification.pdf
PDF • 753.5 KB
PAYE Questionnaire for Service Contracts 2025_2026.doc
DOC • 857.0 KB
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
DOCX • 113.3 KB
0112202_TEMPERATURE MORNITORING List of Tender Returnables_Cat 2_ .pdf
PDF • 246.1 KB
240-62196227 - Life-Saving Rules Standard - Rev7 (Final)_February 2025_signed.pdf
PDF • 554.1 KB
Environmetal Proforma Requirements.pdf
PDF • 67.1 KB
PAYE Questionnaire for Service Contracts 2025_2026(1).doc
DOC • 857.0 KB
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 24 - 19 March 2025.pdf
PDF • 1109.2 KB
Technical Specification for Medupi Power Station Installation of Temperature Monitoring Devices in MV and LV Switchgear Rooms Scope of Work - Rev 2 (003).pdf
PDF • 703.1 KB
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
PDF • 15.2 KB
240-77471651 Annexure C1 OHS Tender Evaluation (High risk).docx
DOCX • 86.0 KB
Temperature Monitoring Devices in Switchgear Rooms Project Specific BRA - Final.pdf
PDF • 314.4 KB
Clarification 1.docx
DOCX • 15.7 KB
Closing date extension letter.pdf
PDF • 167.8 KB
This tender closed on 18 February 2026.
You can no longer bid on it. Award details appear above when the buyer has published them — and the open work below is the closest live equivalent.
Open tenders you can still bid on
Open tenders from ESKOM
- PROVISION OF CIVIL MAINTENANCE SERVICES FOR A PERIOD OF 36 MONTHS AT KOMATI POWER STATION
- PROVISION OF SERVICE, MAINTENANCE, CONSUMABLES AND SPARES FOR GLASSWARE WASHER MACHINE AT ESKOM PETROLEUM SCIENCES (PS) LABORATORIES FOR A PERIOD OF FIVE (05) YEARS ON AN ‘AS AND WHEN’ REQUIRED BASIS.
- The Design, Supply, Installation and Commissioning, of an Integrated Physical Security System at Eskom Academy of Learning. (EAL Smart Integrated Physical Security)
- Purchase, Removal and Collection of scrap conveyor belts at Matimba and Medupi Power Station (Once -Off Tender)
- Supply and Delivery of Rotating Equipment, Rotating Equipment Spares (Components) and Rotating Equipment Auxiliaries at Hendrina Power Station on as and when required basis for the period of 5 years
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.
Draft my method statementBidding on this tender? Prepare it step by step
A free, guided checklist for this specific tender — the documents it needs, what you already hold, and what is still missing.
Prepare this bid (free)