Reference: E3615GXMPDUV
Service, Maintenance, Calibration, Supply of spares
ESKOM
Key Dates
Published
September 30th, 2026
Closing Date
Friday, 30 October 2026 - 10:00
(30 days remaining)
Description
Service, Maintenance, Calibration, Supply of spares and consumables of Lab Instruments at Duvha Power Station on as and when required basis for a period of 60 Months. Category: Services: General Type: Request for Quotation Department: ESKOM
Sectors & Regions
Sectors
Regions
Documents (1)
TENDER DOCUMENTS.zip
ZIP • 8075.6 KB
Related tenders
Open tenders from ESKOM
- The pre-qualification of the various suppliers for Design, Manufacture, Testing, Supply, Delivery and Training of Estimated Quantities of 22kV to 132kV Isolators for Distribution on an “as and when” required basis within a period of sixty (60) months.
- Legal Panel Argumentation of services providers for provision of legal panel on as as and when required basis
- Safely removal of Snakes & Bees-Hives from various structures, Infrastructures, buildings and Eskom equipment within Limlanga Cluster on as an when required basis over a period of 5 years.
- PROVISION OF BUILDING AND INFRASTRUCTURE MAINTENANCE SERVICES AT DRAKENSBERG PUMPED STORAGE SCHEME ON AN AS-AND-WHEN-REQUIRED BASIS FOR A PERIOD OF FIVE (5) YEARS.
- Panel appointment of construction and dismantling of MV and HV distribution substations, traction stations, switching stations and bays within the Mpumalanga area, for voltages ranging from 1.1kV up to and including 132kV on an “as and when” required basis for period of 60 months.
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.
Draft my method statementBidding on this tender? Prepare it step by step
A free, guided checklist for this specific tender — the documents it needs, what you already hold, and what is still missing.
Prepare this bid (free)