Reference: TNPA/2024/11/0006/82453/RFP
Rehabilitation of the Ship Repair Facility in the Port of Mossel
Transnet National Ports Authority
Key Dates
Published
October 28th, 2025
Closing Date
Friday, 13 March 2026 - 16:00
Description
REHABILITATION OF THE SHIP REPAIR FACILITY IN THE PORT OF MOSSEL BAY FOR THE PERIOD OF 24 MONTHS Category: Architectural and engineering activities; technical testing and analysis Type: Request for Proposal Department: Transnet National Ports Authority
Sectors & Regions
Sectors
Regions
Documents (77)
Annexure G_ Contractor Environmental and Sustainable Specifications (TRN-IMS-GRP-GDL-014.4).pdf
PDF • 582.6 KB
Annexure F_TNPA-SHEQ PD-QUAL-SPEC-008 CORROSION PROTECTION.pdf
PDF • 363.2 KB
Drawings 2- Naval Architecture.zip
ZIP • 8161.2 KB
Annexure A - Bill of Quantities.pdf
PDF • 2213.0 KB
Annexure C_Standard-for-Uniformity-August-2019-21-31.pdf
PDF • 443.1 KB
Briefing Meeting Presentation_ Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay.pdf
PDF • 2660.3 KB
Addendum No. 01- Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay.pdf
PDF • 269.8 KB
RFP for Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay.pdf
PDF • 5063.6 KB
Annexure J_ Standard Operating Procedure for Construction Environmental Management.pdf
PDF • 636.6 KB
Drawings - Mechanical Services Engineering.zip
ZIP • 14247.0 KB
Annexure E_TNPA-QUAL-REQ-014.1 General Quality Requirements for Contractors and Suppliers.pdf
PDF • 478.1 KB
Drawings 6 - Architecture.zip
ZIP • 5515.9 KB
Annexure B_ How to submit bids electronically guide for Bidders (1).pdf
PDF • 1835.7 KB
Q&A - Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay.....pdf
PDF • 153.7 KB
Briefing Session Minutes - Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay...pdf
PDF • 236.1 KB
Drawings - Structural Engineering.zip
ZIP • 14044.0 KB
Drawings 3- Naval Architecture.zip
ZIP • 31042.9 KB
Addendum No. 02- Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay.pdf
PDF • 275.4 KB
Addendum No. 03- Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay (002).pdf
PDF • 307.5 KB
BOQ - Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay in excel.xlsx
XLSX • 248.8 KB
Drawings 7 - Architecture.zip
ZIP • 16794.4 KB
Drawings 4 - Architecture.zip
ZIP • 1706.9 KB
Annexure H_ New TIMS Policy Commitment Statement.pdf
PDF • 125.4 KB
Drawings 2 - Architecture.zip
ZIP • 10359.9 KB
Drawings - Electrical Engineering.zip
ZIP • 24293.4 KB
Annexure I_Construction Management Plan.pdf
PDF • 847.1 KB
Annexure D_ Healthy and Safety Specification (1).pdf
PDF • 1079.2 KB
Drawings 5 - Architecture.zip
ZIP • 5246.2 KB
Drawings 3 - Architecture.zip
ZIP • 5017.8 KB
Drawings 1 - Architecture.zip
ZIP
Drawings 1 - Naval Architecture.zip
ZIP
TNPA-INFRA-ENG-SPEC-EEAM-Q-004 GEARING, SHAFTS, BEARINGS, BRAKES, LUBRICATION, VEE-BELTS, KEYS AND WAYS.pdf
PDF • 181.0 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-008 CORROSION PROTECTION.pdf
PDF • 249.8 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-012 GENERAL ELECTRICAL EQUIPMENT.pdf
PDF • 216.6 KB
Form A2 Baseline Training Plan.pdf
PDF • 166.6 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-014 ELECTRICAL MOTORS AND GENERATORS.pdf
PDF • 172.3 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-017 MEDIUM VOLTAGE SWITCHGEAR AND CONTROL GEAR FOR SUBSTATIONS.pdf
PDF • 207.2 KB
Unpriced BOQ - REV.11.pdf
PDF • 1383.1 KB
Addendum No. 04- Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay (002) rev3_signed.pdf
PDF • 302.1 KB
Form A4 Supervisor Agreement.pdf
PDF • 118.3 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-003 STEEL WIRE ROPES.pdf
PDF • 125.9 KB
Form A5 Final Training Report.pdf
PDF • 148.3 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-007 COMPRESSED AIR SYSTEMS.pdf
PDF • 167.5 KB
Form A3 Interim Compliance Training Report.pdf
PDF • 147.2 KB
Copy of Unpriced BOQ - REV.11.xlsx
XLSX • 307.6 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-018 LIGHTING ON EQUIPMENT.pdf
PDF • 165.5 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-009 General Quality Requirements for Contractors and Suppliers.pdf
PDF • 338.2 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-011 MAINTANANCE OF CRANES AND HOIST FOR USE ON PORTS EQUIPMENT.pdf
PDF • 192.5 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-006 STRUCTURAL STEELWORK.pdf
PDF • 214.6 KB
Transnet RFI 09.12.25.pdf
PDF • 145.2 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-020 TESTS ON ELECTRICAL EQUIPMENT.pdf
PDF • 223.2 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-010 REINFORCED CONCRETE AND STRUCTURAL STEEL STRUCTURES.pdf
PDF • 187.1 KB
TNPA-INFRA-ENG-SPEC-EEAM-Q-002 HYDRAULIC EQUIPMENT.pdf
PDF • 164.7 KB
Addendum No. 05- Rehabilitation of the Ship Repair Facility in the Port of Mossel Bay (002) (003).pdf
PDF • 281.8 KB
RFI HI - No.5.pdf
PDF • 77.7 KB
RFI HI - No.1.pdf
PDF • 70.3 KB
RFI HI - No.2.pdf
PDF • 90.5 KB
RFI HI -No.6.pdf
PDF • 82.3 KB
RFI Drawings 02.02.26.zip
ZIP • 7668.1 KB
RFI - As Built drawings 02.02.26.zip
ZIP
RFI HI - No.4.pdf
PDF • 99.8 KB
RFI Subtech.pdf
PDF • 94.2 KB
RFI HI - No.3.pdf
PDF • 53.5 KB
RFI Stefanutti.pdf
PDF • 250.7 KB
RFI Stefanutti - No.13.pdf
PDF • 90.7 KB
RFI Subtech - No.2.pdf
PDF • 52.2 KB
RFI 4.1 HI.pdf
PDF • 81.3 KB
Addendum No 06_REHABILITATION OF THE SHIP REPAIR FACILITY IN THE PORT OF MOSSEL BAY (002) (002).pdf
PDF • 346.4 KB
RFI 14.pdf
PDF • 82.4 KB
TNPA MOSSEL BAY UPRICED BOQ REV 12.pdf
PDF • 1300.6 KB
Unpriced BOQ - REV.12.xlsx
XLSX • 309.0 KB
1002-001-4025 RevB - Main Cradle Bogey B Sub-Frame Integration for Side Support Tower & Hydraulic Docking Arm.pdf
PDF • 394.4 KB
1002-001-4024 RevB - Main Cradle Bogey A Sub-Frame Integration for Side Support Tower & Hydraulic Docking Arm.pdf
PDF • 401.6 KB
RFI 15 HI...pdf
PDF • 51.6 KB
RFI 16 HI.pdf
PDF • 35.8 KB
RFI Coeng- No.1.pdf
PDF • 71.3 KB
RFI -CC 25.02.2026_ (003).pdf
PDF • 159.8 KB
This tender closed on 13 March 2026.
You can no longer bid on it. Award details appear above when the buyer has published them — and the open work below is the closest live equivalent.
Open tenders you can still bid on
Open tenders from Transnet National Ports Authority
- Refurbishment of Queens Warehouse building, Port of Durban for a period of eleven (11) months
- PROVISION OF WATER QUALITY SAMPLING SERVICES AT VARIOUS LOCATIONS WITHIN THE PORT OF DURBAN ON AN “AS AND WHEN REQUIRED” BASIS FOR A PERIOD OF SIXTY (60) MONTHS
- INSTALLATION OF THE SMALLBORE STEEL PIPE WASTEWATER SYSTEM AT THE ALRODE AND WITBANK TRANSNET PIPELINES PETROLEUM PRODUCTS STORAGE AND HANDLING FACILITY
- THE DEVELOPMENT OF MAYDON WHARF PRECINCT STRATEGY IN THE PORT OF DURBAN FOR A PERIOD OF FOUR (4) MONTHS.
- THE MAINTENANCE OF BUILDING AND MARINE DEPOT IN THE PORT OF DURBAN FOR A PERIOD OF SIX (6) MONTHS
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.