Reference: FIN-SCM-TEN-0247
Manufacturing, supplying and delivering of lead Pots
South African Nuclear Energy Corporation Limited
Key Dates
Published
September 2nd, 2026
Closing Date
Wednesday, 07 October 2026 - 11:00
(8 days remaining)
Description
Manufacturing, supplying and delivering of lead Pots on an as and when required basis for a period of three (3) years. Category: Manufacturing Type: Request for Bid(Open-Tender) Department: South African Nuclear Energy Corporation Limited
Sectors & Regions
Sectors
Regions
Documents (8)
1.1 Specification Lead pots.pdf
PDF • 9229.7 KB
4. Necsa Confidentiality Agreement.pdf
PDF • 1536.0 KB
5. SHEQ-INS-0100 Rev 9.0_NECSA Safety, Health and Environmental Policy.pdf
PDF • 1054.3 KB
1. Main.docx
DOCX • 136.2 KB
6. SHEQ-INS-5450-REV5.0.pdf
PDF • 537.4 KB
2. SBD.docx
DOCX • 130.2 KB
7. SHEQ-INS-0102 Rev 4.0 Alcohol & Drugs Control Procedures.pdf
PDF • 136.1 KB
3. NECSA TERMS AND CONDITIONS OF CONTRACT REV 3 ..pdf
PDF • 472.0 KB
Related tenders
Open tenders from South African Nuclear Energy Corporation Limited
- PR000 SAF-RM-09-25 – Rev3 - Rewind motor
- LP-VFH-RFQ-0007-Rev2 - Mazak CNC machine
- LP-VFH-RFQ-0009 – Rev 2 - Tower 3300 - UPS
- Supply of welding management cloud software system and support to Necsa (Advanced Manufacturing) for a period of three years.
- Supply and delivery of - Medium Grade Vermiculite and - Vermiculite Cement Mixture over a period of 3 years.
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.
Draft my method statementBidding on this tender? Prepare it step by step
A free, guided checklist for this specific tender — the documents it needs, what you already hold, and what is still missing.
Prepare this bid (free)