Reference: E2380GXMPKUS
Kusile Power Station Supply of Degrit Sump, Dry Dust
ESKOM
Key Dates
Published
December 15th, 2025
Closing Date
Thursday, 22 January 2026 - 10:00
Description
Kusile Power Station Supply of Degrit Sump, Dry Dust and Switchgear tunnel Resources for a period of 3 years Category: Services: General Type: Request for Bid(Open-Tender) Department: ESKOM
Sectors & Regions
Sectors
Regions
Documents (27)
SBD 1.pdf
PDF • 127.6 KB
Annex-c_Local content Declaration-Summary Schedule.pdf
PDF • 16.1 KB
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
PDF • 15.2 KB
Deviation Schedule.pdf
PDF • 17.5 KB
Labour Taxation Questionnaire.pdf
PDF • 118.0 KB
Eskom - Standard Conditions of Tender - 30 January 2025 (2) (1).pdf
PDF • 626.7 KB
240-126469599_Method Statement template Rev2 final 18 Oct2021.docx
DOCX • 83.4 KB
Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf
PDF • 171.1 KB
SBD 6.2 Local Content in terms of PPR 2017.pdf
PDF • 152.1 KB
Supplier Declaration of Interest form Dec 2012.pdf
PDF • 73.5 KB
SBD 6.1.pdf
PDF • 214.8 KB
NEC Degrit Sump.pdf
PDF • 1136.6 KB
Integrity Declaration Form.pdf
PDF • 265.3 KB
Authorisation Form - 08 November 2024.pdf
PDF • 406.7 KB
E-Tenderers E-Tendering Training Acknowledgement Form.pdf
PDF • 137.3 KB
240-12248652_List of Tender Returnables Rev 7 (002).pdf
PDF • 233.8 KB
Supplier Development Localisation Industrialisation (SDLI) Strategy Supply of Degrit Sump Dry Dust and Switchgear Tunnel Resources at Kusile Power Station for a (004).pdf
PDF • 275.1 KB
KUS-20240611_Kusile_Power_Station_Supply_of_Degrit_Sump_Dry_Dust_and_Switchgear_tunnel_Resources_Contract_Scope_of_Work_Rev_1 (002).pdf
PDF • 300.8 KB
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
DOC • 857.5 KB
240-68099512 Form A_Cat 4_ Rev 9 (002).docx
DOCX • 85.5 KB
240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
PDF • 753.8 KB
Kusile Power Station Supply of Degrit Sump Dry Dust and Switchgear tunnel Resources_ SHE SPEC signed.pdf
PDF • 1278.0 KB
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
PDF • 25.1 KB
Kusile Power Station Tender Technical Strategy Provision of Degrit Sump Resources .pdf
PDF • 220.6 KB
Eskom General Conditions of Purchase.pdf
PDF • 125.8 KB
E-tendering Help Manual for supplier - 27 January 2025-1.pdf
PDF • 870.1 KB
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - Degrit Pump (003).pdf
PDF • 1200.4 KB
This tender closed on 22 January 2026.
You can no longer bid on it. Award details appear above when the buyer has published them — and the open work below is the closest live equivalent.
Open tenders you can still bid on
Open tenders from ESKOM
- PROVISION OF CIVIL MAINTENANCE SERVICES FOR A PERIOD OF 36 MONTHS AT KOMATI POWER STATION
- PROVISION OF SERVICE, MAINTENANCE, CONSUMABLES AND SPARES FOR GLASSWARE WASHER MACHINE AT ESKOM PETROLEUM SCIENCES (PS) LABORATORIES FOR A PERIOD OF FIVE (05) YEARS ON AN ‘AS AND WHEN’ REQUIRED BASIS.
- The Design, Supply, Installation and Commissioning, of an Integrated Physical Security System at Eskom Academy of Learning. (EAL Smart Integrated Physical Security)
- Purchase, Removal and Collection of scrap conveyor belts at Matimba and Medupi Power Station (Once -Off Tender)
- Supply and Delivery of Rotating Equipment, Rotating Equipment Spares (Components) and Rotating Equipment Auxiliaries at Hendrina Power Station on as and when required basis for the period of 5 years
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.
Draft my method statementBidding on this tender? Prepare it step by step
A free, guided checklist for this specific tender — the documents it needs, what you already hold, and what is still missing.
Prepare this bid (free)