Published
September 18th, 2026
Closing Date
Monday, 12 October 2026 - 10:00
(13 days remaining)
Description
Design and Construct Fuel Station at Kusile Power Station for a period of 7 months Category: Specialised construction activities Type: Request for Bid(Open-Tender) Department: ESKOM
Sectors & Regions
Sectors
Regions
Documents (142)
C0 ECC3 Contract cover page(1).pdf
PDF • 122.4 KB
C4 ECC3 Site Information.pdf
PDF • 706.7 KB
Invitation to Tender (ITT) - Fuel Filling Station.pdf
PDF • 1144.1 KB
Fuel Filling Station Scope of Work-latest.pdf
PDF • 1543.3 KB
C1 3 ECC3 Proforma Guarantees.pdf
PDF • 205.7 KB
OHS Specification for fuel station.pdf
PDF • 1413.7 KB
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf
PDF • 314.0 KB
Kusile Fuel Filling Station Tender Technical Evaluation Strategy.pdf
PDF • 321.3 KB
Unpriced BOQ for Fuel Station - 17.09.2026.pdf
PDF • 284.3 KB
Diesel Facility KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdf
PDF • 207.7 KB
Supplier Development Localisation Industrialisation (SDLI) Strategy for Bidders.pdf
PDF • 254.6 KB
C3 1 ECC3 Employers Works Information.pdf
PDF • 852.4 KB
C1 2a ECC3 Data by Employer(1).pdf
PDF • 403.1 KB
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
DOCX • 113.3 KB
C1 1 ECC3 Offer Acceptance(1).pdf
PDF • 153.2 KB
Unpriced BOQ for Fuel Station - 17.09.2026.xlsx
XLSX • 398.1 KB
240-68099512 Form A_Cat 2_ Rev 9.docx
DOCX • 84.8 KB
C2 ECC3 Pricing Data Option B.pdf
PDF • 619.9 KB
E-tendering Help Manual for supplier - 27 January 2025.docx
DOCX • 1103.1 KB
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
DOCX • 116.3 KB
240-109253698 CQP Template- Rev 3.docx
DOCX • 103.0 KB
240-105658000 Supplier QM Spec Rev 3-QM 58 (3).pdf
PDF • 448.4 KB
C1 2b ECC3 Data by Contractor.pdf
PDF • 173.6 KB
240-57617975_2 - Procurement of Power Station Low Voltage Motors Specification.pdf
PDF • 1482.3 KB
240-105020315 Standard for Low Pressure Valves.pdf
PDF • 939.1 KB
240-54937450 Fire Protection and Life Safety Design Standard.pdf
PDF • 3853.2 KB
0.90-23545-1-5 WORKSHOP and STORES PLATFORM ROAD PARKING 1 OF 2.tif
TIF • 758.2 KB
240-56360034 Stationary Vented Lead Acid Batteries.pdf
PDF • 765.8 KB
0.90-23539-2-6 WORKSHOP and STORES FIRE WATER LAYOUT.tif
TIF • 1451.0 KB
240-56359053 Transformer Hand Conditioning Standard.pdf
PDF • 367.5 KB
240-53114248 Thyristor and Switch Mode Charger Converter Inverter Power Supply Standard.pdf
PDF • 5012.2 KB
Kusile Commissioning Completion Procedure.pdf
PDF • 1072.3 KB
090 24714 (Filling Station) SCHEMATIC DIAGRAM DB-FD.pdf
PDF • 142.1 KB
0.90 1940 Plan_Roof Plan_Sections and Elevations.pdf
PDF • 1465.0 KB
0.90-137 Station Layout.pdf
PDF • 559.3 KB
240-58552870 SmartPlant for Owner Operators (SPO) Documentation Metadata Standard.pdf
PDF • 977.8 KB
240-106365693 Standard for the External Corrosion Protection of Plant, Equipment and Associated Piping with Coatings.pdf
PDF • 1360.4 KB
240-75005287 Electrical CoE Internal Design Review Work Instruction.pdf
PDF • 642.8 KB
240-84418186 Roads Specification Manual.pdf
PDF • 754.9 KB
240-56360086 Stationary Vented Ni-Cad Batteries.pdf
PDF • 827.2 KB
Supplier Quality Management Specification.pdf
PDF • 753.5 KB
240-109607736 Eskom KKS Key Part Standard.pdf
240-56355466 Alarm Management System Guideline.pdf
PDF • 1136.9 KB
Sustainability Systems OHS Operational Plan.pdf
PDF • 1283.2 KB
240-85549846 Standard for Design of Drainage and Sewerage Infrastructure.pdf
PDF • 1600.6 KB
240-145581571 - Piping identification and colour coding.pdf
PDF • 844.3 KB
366-215862 Kusile Project Specification for Structural Concrete.pdf
PDF • 2042.0 KB
240-57127955 Geotechnical and Foundation Engineering Standard.pdf
PDF • 785.1 KB
240-56178825 Requirements for Transportation and Movement of Large.pdf
PDF • 368.7 KB
240-86973501 - Engineering Drawing Standard – Common Requirements.pdf
PDF • 990.1 KB
240-56356396 Earthing and Lightning Protection Standard.pdf
PDF • 715.8 KB
240-56357424 MV and LV Switchgear Protection Standard.pdf
PDF • 753.7 KB
240-56227589 List of Approved Electronic Devices to be Used on Eskom Power.pdf
PDF • 918.4 KB
Plant labelling and coding work instruction.pdf
PDF • 1099.8 KB
240-50056004 Constructability Analysis Guideline.pdf
PDF • 733.0 KB
0.90-23547-1-7 WORKSHOP and STORES DIRTY STORM WATER LAYOUT.tif
TIF • 1125.7 KB
240-93576498 KKS Coding Standard.pdf
PDF • 1925.6 KB
01000 EARTHING AND LIGHTING PROTECTION STADARD GUIDELINE0000.pdf
240-56355541 Control System Computer Equipment Habitat Requirements Guideline.pdf
PDF • 451.2 KB
240-145581571 Specification for the Identification of the Contents of Pipelines and Vessels.pdf
PDF • 844.3 KB
0.90_24977_Rev 10.pdf
PDF • 1038.3 KB
240-131806419 Rev 1 Excavating and Trenches work instruction_.pdf
PDF • 4189.8 KB
240-60238757 On-site Dry Out of Power Transformers Within Generation Standard.pdf
PDF • 414.2 KB
240-137465740 Standby Battery Storage In Eskom.pdf
PDF • 301.6 KB
0.90-23548-1-7 WORKSHOP and STORES DIRTY STORM WATER LONG SEC.tif
TIF • 98.3 KB
240-55864504 Belt Conveyor Structural Steelwork and Welding Specification.pdf
PDF • 504.2 KB
366-207469 Kusile Conceptual Architectural Design Specification for Structures and Other Buildings.pdf
PDF • 989.5 KB
240-71432150 - KKS Plant Labelling and Equipment Descriptions Standard.pdf
PDF • 1765.5 KB
Generation Plant Safety Regulations.pdf
PDF • 2288.6 KB
240-73198286 Electrical Plant CoE Operational Plan Work Instruction.pdf
PDF • 444.1 KB
240-131806419 Excavating and Trenches work instruction.pdf
PDF • 4188.8 KB
240-56361454 Under-voltage Protection Standard.pdf
PDF • 471.9 KB
240-56227516 LV Switchgear Control Gear Assembly Associated Equipment for.pdf
PDF • 969.9 KB
240-56355754 Field Instrument Installation Standard Field Installation Requirements.pdf
PDF • 470.6 KB
240-114036246 Occupational Hygiene Health Risk Assessment Work Instruction.pdf
PDF • 426.9 KB
240-91244751 Specification for Geotechnical Investigations Standard.pdf
PDF • 535.2 KB
240-76992014 Technical Documents and Records Management Work Instruction.pdf
PDF • 903.5 KB
240-54937454 Inspection Testing and Maintenance of Fire Protection Systems Standard.pdf
PDF • 2710.6 KB
203-770 Kusile Conrete Specification.pdf
PDF • 2039.1 KB
240-109607332 Abbreviation Standard for Labelling of Plant at Power Stations.pdf
240-54937439 Fire Protection Detection Assessment Standard.pdf
PDF • 1173.1 KB
240-125815990 CommCompletionKPSP-Rev1.pdf
PDF • 1546.7 KB
240-56358900 Sampling and Testing of Mineral Insulating Oil for Power.pdf
PDF • 1735.6 KB
240-56630085 Arrangement Design Guideline.pdf
PDF • 606.9 KB
240-56179027 Safety Measures Protective Equipment for Electric Arc.pdf
PDF • 1501.4 KB
240-131750549 Earthing and Lightning Protection Concept.pdf
PDF • 1602.0 KB
P146838-0UXC-S3336C-R05 Service Air TP.pdf
PDF • 6051.9 KB
240-128515850 Documentation Handover Specification.pdf
PDF • 1277.7 KB
Eskom life-saving rules.pdf
PDF • 312.1 KB
240-54179170 Technical Documentation Classification and Designation Standard.pdf
PDF • 1326.7 KB
240-50237155 New MV Motor Procurement Standard.pdf
PDF • 1480.5 KB
36-1126 Specification for corrosion protection of plant and equipment with coatings.pdf
PDF • 478.7 KB
240-56355789 Flow Measurement Systems Installation Standard.pdf
PDF • 585.1 KB
240-56355815 Field Instrument Installation Standard Junction Boxes and Cable Termination.pdf
PDF • 1666.5 KB
240-83539994 Standard for Non-Destructive Testing NDT on Eskom Plant.pdf
PDF • 661.3 KB
240-56355843 Pressure Measurement Systems Installation Standard.pdf
PDF • 397.2 KB
240-49910508 Environmental Analysis Guideline.pdf
PDF • 733.1 KB
240-56361435 Transport of Power Station Electric Motors Standard.pdf
PDF • 897.4 KB
240-125171334 Guideline for the Design of Ash Disposal Facilities for Coal Fired Power Stations.pdf
PDF • 582.4 KB
32-245 Waste Management Standard.pdf
PDF • 2444.1 KB
240-123801640 Specification for Low Pressure Pipelines Standard.pdf
PDF • 1798.8 KB
240-57127953 Execution of Site Preparation and earthworks.pdf
PDF • 522.1 KB
240-56355729 - Plant Control Modes Guideline.pdf
PDF • 597.1 KB
240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear.pdf
PDF • 1520.8 KB
240-56356376 On-Site Commissioning for Low Pressure Systems Standard.pdf
PDF • 1480.3 KB
240-68973110 Specification for Power Transformer rated for 1.25MVA a.pdf
PDF • 1877.5 KB
240-56227778 Fault Current Calculations Rating Switch-Gear Standard.pdf
PDF • 1061.2 KB
240-56535950 Electrical Plant Information Files Standard.pdf
PDF • 115.3 KB
090 - 24713(Filling Station) LIGHTING, SMALL POWER AND LIGHTNING PROTECTION LAYOUT.pdf
PDF • 333.2 KB
0.90-55181 Kusile Power Station Filling Station.pdf
PDF • 196.1 KB
240-56355728 Human Machine Interface Design Requirements Standard.pdf
PDF • 428.8 KB
203-1239 Architectural Design Spec R2 final.pdf
PDF • 989.5 KB
0.90-23540-1-8 WORKSHOP and STORES CLEAN SW LAYOUT.pdf
PDF • 600.0 KB
240-150475305 Rev 3 Defect Management Work Instruction.pdf
PDF • 4186.6 KB
240-56176852 Essential Power Supplies for Power Stations.pdf
PDF • 486.6 KB
0.90-24713 Filling Station_ Plan Lighting _ small Power _ Lightining Protection Layout.pdf
PDF • 333.2 KB
203-13626 Rev4 150310 Trench Excavation Procedure.pdf
PDF • 122.7 KB
240-56227443 Requirements for Control and Power Cables for Power Station Standard.pdf
PDF • 1419.3 KB
240-125815990 - Kusile Commissioning Completion Work Instruction.pdf
PDF • 1071.6 KB
240-56364545 Structural Design and Engineering Standard.pdf
PDF • 775.1 KB
0.90-23539-1-8 WORKSHOP and STORES PORTABLE WATER LAYOUT.tif
TIF • 1463.7 KB
240-56356396 - Earthing and Lightning Standard.pdf
PDF • 836.9 KB
0.90-23542-1-8 WORKSHOP and STORES CLEAN SW LONGSECTIONS 2 OF 3.pdf
PDF • 223.9 KB
240-55714363 Coal-Fired Power Stations Lighting and Small Power Installation Standard.pdf
PDF • 897.3 KB
240-57648795 Additional Technical Requirements for Mini-substations Guideline.pdf
PDF • 520.8 KB
240-56356491 DC Earth Fault Detection Manual.pdf
PDF • 463.1 KB
240-56356510 Definitions of Terms Applicable to DC Emergency Supplies Standard.pdf
PDF • 557.5 KB
240-107981296 Constructability Assessment Guideline.pdf
PDF • 861.1 KB
240-56355731 Environmental Conditions for Process Control Equipment Used at Power Stations Standard.pdf
PDF • 636.2 KB
240-107305502 SmartPlant Data Take-On Standard.pdf
PDF • 787.8 KB
Addendum - Additional Supporting Documents.pdf
PDF • 168.7 KB
0.90-71685 Site Finishing - Site Plan - Area 17D.pdf
PDF • 330.4 KB
240-56364537 - Design of Steel Structures.pdf
PDF • 400.8 KB
240-56536505 Hazardous Location Standard.pdf
PDF • 915.7 KB
240-56536488 Control of Works Performed on Large Power Transformers Standard.pdf
PDF • 351.4 KB
240-61227631 Piping and Instrumentation Diagram P and ID Standard.pdf
PDF • 2416.5 KB
240-106628253 Standard for Welding Requirement on Eskom plant.pdf
PDF • 668.4 KB
240-92460850 Geotechnical Standard for CSY and ADF Site Investigation.pdf
PDF • 403.1 KB
240-132735850 Kusile Engineering Change Management Procedure.pdf
PDF • 1003.1 KB
240-54937450 Fire Barrier Seals for Electrical Cable Installations.pdf
PDF • 293.7 KB
Addenda - Technical Evaluation Criteria 22.09.2026.pdf
PDF • 171.6 KB
Fuel Filling Station Technical Evaluation Strategy22.09.2026.pdf
Related tenders
Open tenders from ESKOM
- PROVISION OF CIVIL MAINTENANCE SERVICES FOR A PERIOD OF 36 MONTHS AT KOMATI POWER STATION
- PROVISION OF SERVICE, MAINTENANCE, CONSUMABLES AND SPARES FOR GLASSWARE WASHER MACHINE AT ESKOM PETROLEUM SCIENCES (PS) LABORATORIES FOR A PERIOD OF FIVE (05) YEARS ON AN ‘AS AND WHEN’ REQUIRED BASIS.
- The Design, Supply, Installation and Commissioning, of an Integrated Physical Security System at Eskom Academy of Learning. (EAL Smart Integrated Physical Security)
- Purchase, Removal and Collection of scrap conveyor belts at Matimba and Medupi Power Station (Once -Off Tender)
- Supply and Delivery of Rotating Equipment, Rotating Equipment Spares (Components) and Rotating Equipment Auxiliaries at Hendrina Power Station on as and when required basis for the period of 5 years
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.
Draft my method statementBidding on this tender? Prepare it step by step
A free, guided checklist for this specific tender — the documents it needs, what you already hold, and what is still missing.
Prepare this bid (free)