Reference: TPL/2026/09/0661/12155/RFQ
Provision for the Calibration of Two (2) Anton Paar Dma 35
Transnet SOC Ltd
Key Dates
Published
September 25th, 2026
Closing Date
Tuesday, 29 September 2026 - 16:00
(2 days remaining)
Description
PROVISION FOR THE CALIBRATION OF TWO (2) ANTON PAAR DMA 35 DENSITY METERS AND ONE (1) ANTON PAAR DMA 4500 M DENSITY METER FOR TALTON WORKSHOP ON ONCE-OFF BASIS Category: Manufacture of electrical equipment Type: Request for Quotation Department: Transnet SOC Ltd
Sectors & Regions
Sectors
Regions
Documents (1)
PPA-127595 - CALIBRATION OF 2X DMA 35 ANTON PAAR.pdf
PDF • 418.8 KB
Related tenders
Open tenders from Transnet SOC Ltd
- DESIGN, SUPPLY, REPAIRS, MODIFICATION, INSTALLATION, TESTING AND COMMISSIONING OF TRACTION (3KV DC AND 25KV AC) AND DISTRIBUTION (11 KV & 6.6 KV AC) SUBSTATIONS ON AN AS AND WHEN REQUIRED BASIS FOR A PERIOD OF TWENTY-FOUR (24) MONTHS, NORTH & NORTH-EAST CORRIDORS
- Site Contamination Assessment at Transnet Pipelines Facilities (Pipeline, Depots and Pump Stations) During Emergency Spills for a period of three years, for sites that are located in Gauteng, Mpumalanga, Free State and North-West Provinces on an “as and when required basis”
- FOR THE PROVISION OF STEEL WORK REPAIRS AND MAINTENANCE FOR DREDGING SERVICES FLEET FOR A PERIOD OF FIVE (5) YEARS ON AN “AS AND WHEN” REQUIRED BASIS
- REQUEST FOR THE APPOINTMENT OF A SERVICE PROVIDER FOR THE SUPPLY AND DELIVERY OF CONSUMABLE MATERIAL FOR THE FOR THE MANUFACTURING AND MARITIME BUSINESSES, TRANSNET ENGINEERING DURBAN ON AN ‘AS AND WHEN’ REQUIRED BASIS FOR A PERIOD OF TWO (2) YEARS
- MAINTENANCE OF RAILWAY TRACK WITH ON TRACK BALLAST REGULATING MACHINES FOR THE WESTERN REGION
Win this tender
Free help to prepare your bid and price it with real supplier quotes.
We compile the whole bid pack
Every returnable completed, compliance documents placed where the tender asks for them, technical response drafted, assembled in the order the buyer specified — ready for you to check and sign.
Compile my bidHave your bid checked before you submit
Most rejected bids never reach the pricing stage — a missing form, an unsigned page, an expired certificate. We check yours page by page against that tender's own requirement list.
Check my bidWin the functionality points
Where a tender is scored on more than price, the technical response is where the marks are. Written against the actual scope, in the structure panels score.
Draft my method statementBidding on this tender? Prepare it step by step
A free, guided checklist for this specific tender — the documents it needs, what you already hold, and what is still missing.
Prepare this bid (free)